Mining specification

The main capacity will be located next to the solar and wind power stations.
Mining farm on station:
🔹 300 miners are planned for installation, each with ~3 kWh consumption and a hashrate of 270 Th/s. 🔹 The total capacity will reach 81,000 Th/s. 🔹 The farm will be connected to a pool, while maintaining the option of SOLO mode to test efficiency.
Mining farm on EVs:
🔹 Potential fleet coverage of up to 200 electric vehicles, adding another 46,800 Th/s of power.
🔹 Mining farms will not operate 24/7 — instead, they are proposed to run in SOLO mode for additional block rewards, with the ability to switch back to pool mining.
🔹Calculations are based on 10 hours of operation per day.